Abstract:
A serious worldwide infrastructure problem is the sudden, often dramatic failure of underground high- voltage AC power distribution cables. This research is aimed at finding economical ways of measuring the health of in-service cables operating at tens of kilovolts, to permit their selective replacement.
Project end date: 02/27/14
Publication date:
February 4, 2014
Publication type:
BSAC Project Materials (Final/Archive)
Citation:
PREPUBLICATION DATA - ©University of California 2014